Bkr 14
2,200 sq.ft.
5 Bedroom
2 Bathroom
Off street parking
Total Renovation
Smart Duplex

Bkr 14
Two is better than one.
AWESOME opportunity for a "house hack" individual that would like to have a piece of the American dream while building generational wealth.
Overview
INTRO
SAFE & SOUND?
DEMOLITION?
PRE-DEMOLITION WALKTHROUGH
BASEMENT
FRONT EXTERIOR
REAR EXTERIOR
MAIN LEVEL WALKTHROUGH
2ND LEVEL WALKTHROUGH
TREE REMOVAL
TECHNOLGY
MEET MY CREW
TEAR THE ROOF OFF THIS MUTHA SUCKA
Scope of

#1 Cut down 2 oak trees remove old tree trunks and bushes. Remove 2 trees in rear of house.
#2 Replace sidewalk.
#3 Replace exterior stairs with storage area under rear stairs.
#4 Repair/Reinforce porches. Install new decking.
#5 Install custom chevron railings.
#6 Replace/paint all the exterior doors.
#7 Replace windows and cover the kitchen/bathroom windows.
#8 Conduct a lateral test.
#9 Replace gutters & downspouts.
#10 Replace/repair soffit and fascia.
#11 Replace roof with gray architectural shingles. (conditional review)
#12 New plumbing throughout.
#13 Repair chain link fence and reroute some areas.
#14 Install new light wood railroad ties retaining walls.
#15 Install 12in. modern address numbers with lighting.
#16 Excavate rear yard, demo garage, create a 3 car parking pad with loading area.
#17 Excavate the basement floor.
#18 Replace basement stairs.
#19 Replace and add structural support beams.
#20 Clean glass block/replace 3 basement window(s)
#21 Rough-In & frame out two laundry rooms. Replace interior doors. Install 2 wash boxes with drain. Install recess lighting. Install ceramic flooring.
#22 Install drywall & insulation throughout the interior/ceiling outer walls. R19 & R13
#23 Revamp interior stairs and railing with custom walls.
#24 New LVP flooring & ceramic flooring.
$25 New interior doors with modern hardware.
#26 New bathrooms: bathtub combos, vanities, fixtures, lighting, add vents/ductwork.
#27 New kitchens; close windows, install new cabinets and fixtures, new sink, dishwasher, microwave, refrigerator, gas stove (X2).
#28 Design focal wall(living room)
#29 New HVAC with central air(need new ductwork), Gas H20 tanks, New 200 amp service panels/electrical throughout (X3).
#30 New wall mounted server cabinet. High speed Cat6 ethernet cables throughout.
#31 Add trim work throughout. Paint interior walls/ceilings and exterior trim.
#32 Install tile on bathroom walls/floors and kitchen backsplash.
#33 Install Amazon smart home technology.
Smart locks, cameras, Ring doorbells, water shut-offs.
#34 Install exterior recessed lighting.
#35 Install layered security system.
#36 Install modern mailboxes
#37 Install wooden modern style rear fencing.
#38 Replace main gas line.
#39 Install modern address placards
#40 Landscape/hardscape.
Tree Removal













The Updates

















Before & Now

Exterior front new custom chevron railings

Created new storage space under stairs.

Created a modern railing for the new tenants.

Exterior front new custom chevron railings





The PROCESS
Episode 1
Failure is not an option
Episode 2
We're Back Baby
Episode 3
NEW
Moving to phase 2
Episode 4
Loving the Community 101
Bkr 14
Our goal is to be transparent and efficient.
The nifty fifty
50 PRE DEMOLITION PHOTO GALLERY.